Operational Standards Rules
The Explanatory Notes to the Draft Building Safety Bill, were initially published by the Ministry of Housing, Communities & Local Government on 20 July 2020, and suggested that Operational Standards Rules are ‘Rules for local authorities and building control bodies setting out the performance requirements to be met in the exercise of their building control functions.’
The final relevant provisions for operational standards rules (OSRs) are set out in sections 58Z – 58Z10 of the Building Act 1984. The regulatory authority may revise the OSRs and publish those revisions at any time. The guidance 'operational standards rules' (OSRs) is also available from the UK government via the link.
OSRs apply to building control functions delivered by local authorities and registered building control approvers. The OSRs adopt the definitions within the act, including:
- building control functions in section 58Z (3)
- duty holder in schedule 1
- initial notice in section 47
- local authority in section 126
- regulatory authority in section 58A
- registered building control approver (RBCA) in section 58N
- registered building inspector (RBI) in section 58B
- restricted activities and functions in section 46A
Local authorities and RBCAs must comply with the OSRs. The regulatory authority may take action against those who fail to fulfil the requirements of the OSRs. The guidance 'operational standards rules' (OSRs) sets the detail of these, within four categories which are as follows:
- Systems and controls
- Persons involved in the delivery of building control functions
- Building control functions
- Enforcement and intervention
[edit] Related articles on Designing Buildings
Featured articles and news
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.